1. |
Jasa Impian Sdn Bhd |
Supply & Delivery of twenty four (24) numbers of Royston Handicap Patch - Completed |
2010 |
2. |
Petronas Dagangan Berhad/PBJV Group |
Service Order - Extension Contract Of CP Supervisor for New ICCP System On The
Upgrading Of Bunkering Facilities at Bintulu,Sarawak - Completed
|
2010 |
3. |
Petronas Dagangan Berhad/PBJV Group |
Service Order - Supply & Fabrication of Electrical Copper Busbar and Phenolic Board For
The Upgrading of Bunkering Facilities at Bintulu Sarawak - Completed
|
2010 |
4. |
Petronas Dagangan Berhad/PBJV Group |
Supply & Delivery of Additional CP Materials, Big Fink Test Post & Royston Handycap for New ICCP System On The Upgrading Of Bunkering Facilities at Bintulu,Sarawak
|
2010 |
5. |
Carigali Hess/Shapadu Energy & Engineering |
Supply & Delivery of BAND-IT Electrical Accessories, Electrical Cables and Compression
Tools For W.O 123 Maintenance Services Contract of Carigali Hess TFMS Project - Completed
|
2010 |
6. |
Boustead Naval Shipyard |
Supply & Delivery of one (1) number of Electronic Thermistor Black/Black 150C - Completed |
2010 |
7. |
Carigali Hess/Shapadu Energy & Engineering
|
Supply & Delivery Of 1 Tonne Kobelco Welding Electrodes For W.O 85 Carigali Hess York
Refrigeration Compressor Shelter TFMS Project - Completed
|
2010 |
8. |
Carigali Hess/Shapadu Energy & Engineering |
Supply & Delivery of Metrode Duplex Stainless Steel Welding Electrodes & Filler Rods For W.O 91
Hook Up And Commissioning Of Bumi Shallow Flowlines TFMS Project - Completed
|
2010 |
9. |
Boustead Naval Shipyard |
Supply & Delivery of one (1) number of Electronic Thermistor Black/Black 150C - Completed
|
2010 |
10. |
Petronas Carigali Sdn Bhd/TL Offshore Sdn Bhd |
Supply & Delivery of four (4) numbers of 8" & 20" Manual External Pipe Clamps for B-Fab
MOC Pool Package Pipelay Project - Completed |
2010 |
11. |
ACES Sdn Bhd |
Supply & Deli
very of twenty four (24) numbers of Royston Handicap Patch and 20 tubes
of 15g Erico cadweld charges powder - Completed |
2010 |
12. |
Lion Group Berhad/ Lion DRI Sdn.Bhd |
Service Order - Cathodic Protection Rectification and Corrective Maintenance Work at
16” Natural Gas Pipeline from Metering Regulating Station (MRS) To ML209 Dengkil,
Selangor - Completed |
2010 |
13. |
Carigali Hess/Shapadu Energy & Engineering |
Supply & Delivery of Electrical Cables and BAND-IT Electrical Accessories For W.O 108
Installation Of 3 Phase Socket Outlet at CKP Metering System TFMS Project - Completed
|
2010 |
14. |
Vietsov Petro Vietnam/Corrpro Asia Pte Ltd |
Service Contract for 6 (six) Month On External Corrosion Direct Assessment (ECDA) Survey For 200KM Underground Gas Pipeline,Vietnam - Ongoing
|
2010 |
15. |
Carigali Hess/Shapadu Energy & Engineering |
Supply & Delivery of Cable Gland, Insulated Terminal Pin,Stainless Steel 316L Bolts/Nuts and
Stainless Steel 316L Valve Bulkhead For W.O 141 Carigali Hess TFMS Project - Completed
|
2010 |
16. |
ExxonMobil EMEPMI /Shapadu Energy & Eng |
Supply & Delivery of 2 Unit Pneumatic Air Light (Wolf Turbolite) for Construction Service of
ExxonMobil EMEPMI Brownfield Project - Completed
|
2010 |
17. |
Carigali Hess/Shapadu Energy & Engineering |
Supply & Delivery of Pipes, Pipe Fittings, Gaskets, Studbolts and Valves For W.O 172 Bumi Deep Carigali Hess TFMS Project, July Shutdown - Completed
|
2010 |
18. |
Carigali Hess/Shapadu Energy & Engineering |
Supply & Delivery of Studbolts and Gaskets for W.O 155 To Replace Leaking Of 16" MOV Valve At CKP Metering System Carigali Hess TFMS Project - Completed
|
2010 |
19. |
Carigali Hess/Shapadu Energy & Engineering |
Supply & Delivery of Stainless Steel 316L Tubings,Unions and Ferrules for W.O 170 Venting Line From Songkhla Launcher Facilities To HP Flare System, TFMS Project - Completed
|
2010 |
20. |
Petronas Carigali (Turkmenistan)/Sigur Ros |
Supply & Delivery of Kobe Welding Electrodes and Welding Consumables For Turkmenistan Block 1 Gas Development Project - Completed |
2010 |
21. |
Carigali Hess/Shapadu Energy & Engineering |
Service Order - Design & Fabrication of HP Flare Pump Hose c/w 150# Stainless Steel 316L Flanges At Both End For W.O 215 Carigali Hess TFMS Project - Completed
|
2010 |
22. |
Petronas Dagangan Berhad/PBJV Group |
Service Order - NACE Endorsement for ICCP As-Built Documentation for the Upgrading of Bunkering Facilities at Bintulu Sarawak - Completed |
2010 |
23. |
ExxonMobil EMEPMI/ Shapadu Energy & Eng |
Supply & Delivery of 2" & 6" Stainless Steel 316L SCH 80 Pipes For Construction Services Of ExxonMobil EMEPMI Brownfield Projects, WPS Development - Completed |
2010 |
24. |
Petronas Gas Berhad Regional Shah Alam |
Service Order - Onshore Fabrication To Erect Existing CP Test Post and Replace New CP Test Post c/w Concrete Base Foundation, New Thermit Weld Connection To Pipe and New CP Electrical Cabling System - Completed |
2010 |
25. |
Lion Group Berhad/Lion DRI Sdn.Bhd |
Service Order - To Supply Manpower,Tools,Equipment & Material to Conduct Test,CIPS & DCVG Survey For 16" Natural Gas Pipe Line From Metering & Regulating Station (MRS) To ML209 Dengkil for Cathodic Protection System - Completed |
2010 |
26. |
Carigali Hess/Shapadu Energy & Engineering |
Service Order - Design & Fabrication of 12 Numbers Carbon Steel Swivel Pin c/w 15mm Pin Hole 25mm (Dia) x 270mm (Length) For W.O 85 Carigali Hess TFMS Project - Completed
|
2010 |
27. |
Carigali Hess/Shapadu Energy & Engineering |
Service Order - To Fabricate, Install & Commissioning Of GRE Piping For New Bunkering Station c/w 150# Stainless Steel FF Flange, Stainless Steel Camlock Coupling & Stainless
Steel Dust Cap/Plug For W.O 192 Carigali Hess TFMS Project - Completed
|
2010 |
28. |
Carigali Hess/Shapadu Energy & Engineering |
Supply & Delivery of 8" Duplex Stainless Steel Pipes, Duplex Stainless Steel Elbows & A105N Flanges For W.O 109 Bumi Deep Carigali Hess TFMS Project - Completed
|
2010 |
29. |
Carigali Hess/Shapadu Energy & Engineering |
Service Order - Design & Fabrication of Bird Mesh Screen c/w A350 LF2 Flange And SS316L Plate,14 Gage (Thk),Silicon Aluminum 3 Layer Coated For W.O 109 TFMS Project - Completed
|
2010 |
30. |
East Timor Gov/ Corrpro Asia Pte Ltd |
Service Order - External Corrosion Direct Assessment (ECDA) Survey For 8" & 12" Diameter Coated Mild Steel Water Pipeline at Dili Town,East Timor - Completed
|
2010 |